Side streets, San Lu Rae to Ogden
“…require students to cross Lake Drive.”
San Lu Rae already hit 233% of its legal spaces in the 2025 study.3
One structure next to the high school gets student cars off crowded side streets, adds a signal at Lake & Bagley, and frees curb space the city can turn into bike lanes.
Illustration of what the bond resolution allows. The City Commission decides which streets change, with public input.6
The ballot, the bond analysis, and the city’s traffic engineer.
streets a student crosses when parking in the deck.
City traffic engineer’s memo, 2025school-lot use during school hours, measured before the renovation removed 72 spaces.
City parking study, 2025 · EGRPSa year per $100,000 of taxable value, the ballot’s 20-year average.
Official ballot language · 0.4925 millsThe high school had 216 parking spaces before construction. When the project finishes in 2030 it will have about 144.20 The city’s traffic engineer studied where those cars could go. Here’s what he wrote about students on foot.1
on-site spaces before construction
on site, plus a temporary lot of about 155
on site, and “no site exists” for another temporary lot
on-site spaces for good: 72 fewer than before
High school parking, per EGR Public Schools, Sept. 30, 2026.20See the letter ↗
“…require students to cross Lake Drive.”
San Lu Rae already hit 233% of its legal spaces in the 2025 study.3
“Students will need to cross Lakeside Drive.”
The engineer expected many students to park on side streets anyway.1
“…will not be required to cross any streets.”
With a 10-foot pedestrian path, heated sidewalks and a drop-off lane.7
The traffic engineer found high schoolers already using “residential streets from San Lu Rae Drive to Ogden Avenue.”1 The no-deck plan counts on those same blocks to absorb the spaces the school is losing, because on paper they have room.1
Having room isn’t the same as being a quiet street. The deck gives student cars a place to go that isn’t someone’s front curb. At the earlier 213-space design, the city manager put it at “a net gain of 92 spaces” over what the school had before construction.5 The bond resolution names the goal outright: “reducing the need for on-street and surface parking.”6
EGR adopted a Mobility/Bike Action Plan in 2021 to “complete a safe and connected network of cycling facilities.”18
The catch: the plan was built “without impacting on-street parking.” So Wealthy between Lovett and Lakeside is getting painted sharrows, not a bike lane.18
The bond resolution says moving city parking into the garage frees street space for dedicated lanes for e-bikes, scooters and bikes, and advances the Mobility Plan.6
Today the site is an open surface lot. Design is paused until the vote, so these are the features on the table and the standards residents can hold it to.7,9
The city expects it to “facilitate safer crossings for pedestrians” and improve peak-hour traffic management.6
A dedicated lane next to the Performing Arts Center and Door #35, keeping pickup lines out of the travel lane.20
Along the north edge, separated from car traffic, with access to the Community Pool.20
Around the whole perimeter. No ice on the walk in January.7
Two stair towers, plus an elevator by the Performing Arts Center entrance.7,20 Federal guidance: put them on the perimeter, behind glass, visible from outside.12
The same guide calls lighting “the single most important” security feature, plus CCTV where warranted.12
The engineer expected after-school exits to “cause less network traffic issues,” with fewer cars circling side streets for a spot.1 The same memo flags morning backups on Bagley and a 30–60 minute load-out with a single exit.1 That’s why the bond funds the signal and a separate drop-off lane, and why exit design is still open until after the vote.6,9
After residents reported “a lot of near misses” on Lakeside, the city tested temporary traffic circles from August to October 2025. Feedback split 50/50 and they came out.16,17 A signal and a separated lane don’t depend on every driver getting it right every time.
$9,000,000 borrowed, $13,212,282 repaid over 20 years at an estimated 4.13%. The rate falls every year as the city’s tax base grows.6
| Taxable value | Year one | Average | Final year |
|---|---|---|---|
| $100,000 | $59 | $49 | $41 |
| $200,000 | $118 | $99 | $81 |
| $300,000 | $178 | $148 | $122 |
Taxable value is on your tax bill, and is usually well below market value. Operating costs are estimated at $130K–$160K a year, shared with the schools.2,10
Short answers from city documents, the engineer’s memo, and state law. Sources are numbered at the bottom.
“There’s no shortage. The village is only 72% full.”
That’s all 1,310 spaces, from the D&W to Waterfront Park. School lots ran 80–87% on school days, before 72 spaces disappeared. Averages are great until you need a spot at 7:45 a.m.3
“371 spaces sat empty at peak.”
Somewhere in Gaslight Village. A student with a first-hour class needs one next to the high school.3
“School lots are half empty after 3 p.m.”
True, and beside the point. The 72 missing spaces are needed during the school day, not for the 6 p.m. rush.3
“The crowded streets are just illegal parking. Enforce it.”
Ticketing doesn’t create parking. It moves the same cars one block over.3
“The engineer said not to build any parking.”
That was his first pass in Nov. 2025. In Feb. 2026 he wrote some of those options “may not be feasible due to certain on-campus limitations.”1
“The $158.9M school bond should have covered this.”
It tried. The plan had underground parking, which turned out not to be buildable. The district pays its half of construction from existing resources.4,20
“Spend it on teachers, not brick and mortar.”
Michigan doesn’t allow it. Bond money can only fund capital projects, never salaries.19
“A structure this size belongs on a commercial corridor.”
The cars belong to high schoolers. Park them a corridor away and they’re crossing Lake Drive again.1
“The intersection will fail. LOS F, even with a 2-story deck.”
LOS grades rush-hour wait times for drivers, not safety. A 2-story deck (about 136 spaces) holds fewer cars than the two lots it replaces held before construction (160).1 If that version fails, the same cars were already overloading a corner with no signal at dismissal. The fix for that is a signal, and it’s in this bond.6
“It needs a $350K–$600K signal just for the garage.”
The signal (about $500K) is paid for by this bond and will make crossings safer. That’s the solution, not the problem.6,9
“Cars will back up into the garage.”
The memo does flag a 30–60 minute load-out with one exit. That’s why exit design matters, and it’s still open until after the vote.1,9
“It’s a 3–4 story tower.”
Three levels. 240 spaces.7
“‘Mixed-use’ means a transit hub with outside buses.”
The ballot says a public parking facility, signals, and pedestrian and micromobility safety. No buses, no hub.6
“Bagley is too short and narrow.”
A short street right next to the school is where you want the cars to stop, instead of spreading them over a dozen residential blocks.1
“Parking garages are the #3 spot for violent crime.”
That FBI category lumps every lot and garage together, and this site is already a parking lot. The research usually cited is a how-to for safe garages: glass stairs, bright light, clear sightlines.11,12
“Picture a student alone on an upper level after rehearsal.”
Now picture that student today, walking to a car on a dark side street across Lake Drive. A lit, glass-walled deck next to the school is the better walk.1,12
“Car thefts happen in parking settings.”
Cars get stolen where cars are parked. Moving them to the curb doesn’t change that. Lighting and visibility do.12
“It will cost taxpayers $16M, even $20M.”
The city’s bond analysis says $13,212,282 over 20 years. The schools’ half comes from funds already on hand, and there’s no new school tax on this ballot.6,9
“That’s $250,000 per parking space.”
Only if you divide by 72 instead of 240. It’s $64K–$75K per space, split two ways.7,10
“$200K+ a year to run, plus policing.”
The city estimates $130K–$160K a year in total, shared with the schools.2,10
“The last deck was torn down at taxpayer expense.”
The old Jade Pig deck was private. It came down in Jan. 2025 for a private redevelopment, and that plan includes a new deck.13,14
“The Commission rushed it with an emergency meeting.”
The Aug. 6 meeting fixed a typo: “$0.44925” should have read “$0.4925.” Rushed or not, the final say is yours.6
“Nobody asked residents.”
The school–city committee held three public input meetings, plus separate sessions with the Gaslight Village business association, business owners to the north, and the Bagley condo residents next door. The slides are at egrps.org/parking.20
“A judge just ruled against the city.”
On a different project, the D&W / Gaslight Investors plan. Nothing to do with Bagley.14
Whether the city may borrow up to $9,000,000 over no more than 20 years for part of the cost of a public parking facility on Bagley at the high school lot, traffic signals at Lake and Bagley/San Lu Rae, and pedestrian and micromobility safety infrastructure.6
During school hours, about two-thirds of the spaces are school-only and the rest are public. Outside school hours and on non-school days, the whole deck is open, first-come, first-served, and school event attendees aren’t charged.20 Parking is intended to be free.8
Three levels and up to 240 spaces; the district says the final number could be lower but not higher.7,20
The 2023 bond renovation expands the high school onto the senior lot. The underground parking originally planned wasn’t feasible. The school goes from 216 spaces before construction to about 144 after.4,20
That’s the idea. Students already park on residential streets from San Lu Rae Drive to Ogden Avenue, and without a deck the plan is to send the displaced cars there.1 The deck adds spaces beyond what was lost, a net gain of 92 at the earlier design, and the bond resolution’s stated goal is reducing on-street parking.5,6
Both effects are in the record. The signal is expected to improve peak-hour traffic management, and the engineer expected less network traffic after school.1,6 He also warned of morning backups on Bagley and a 30–60 minute load-out with a single entrance, so the final exit design matters.1
Level of Service is how traffic engineers grade an intersection’s delay, A through F, based on the average wait per car at the busiest 15 minutes. F means an average wait over about 50 seconds at a stop sign or 80 seconds at a signal. It’s a measure of driver delay, not of crashes or pedestrian safety, and long waits on a side street are one of the standard reasons to install a signal.
The 72 spaces are still gone, and from 2028 to 2030 the school will have about 65 spaces with no room for a temporary lot.20 The alternatives the engineer studied send student cars to side streets or to a lot across Lakeside Drive.1,10
Pledges are only counted; names are never published. If you ask for a reminder, your email is used only for voting reminders from this site, never shared, and every email has a one-click unsubscribe. Use the feedback form to have your pledge removed.
This site only works if the facts are right. If you see an error, have a document we should read, or have a question, send it here. We’ll check it and fix what’s wrong.
Name and email are optional. We use your email only to reply, and never share or publish it.
Zero street crossings for student drivers. A signal at Lake & Bagley. Curb space for bike lanes. About $49 a year per $100,000 of taxable value.
0neighbors have pledged to vote yes
Polls open 7 a.m. to 8 p.m. You can also vote early or by absentee ballot.